Constructing a new Water TowerConstructing a new Water Tower
Start: May 2009 | End: May 2010
Description: As part of the revitalization of the OSU Water Treatment Plant, one of the key components is the new 500,000 gallon water storage tower. Last winter, new water lines were installed to service the tower, and the foundation was poured. This week, Maguire Iron, Inc., of Sioux Falls, South Dakota, has started to put together the large steel panels that make up the tower. The dozens of large steel panels delivered from the factory will be welded together into four major parts. Once they are ready, a 500 ton crane will hoist the stem, bowl bottom, and bowl top into place.
 
McFarland Street ResurfacingMcFarland Street Resurfacing
Start: June 2005 | End: June 2005
 
Phase IV UtilitiesPhase IV Utilities
Start: May 2005 | End: December 2005
 
Hedge Field Renovation & UpgradesHedge Field Renovation & Upgrades
Start: May 2005 | End: July 2005
Description: Hedge Field renovation.
 
Boone Pickens Stadium Turf ReplacementBoone Pickens Stadium Turf Replacement
Start: May 2005 | End: September 2005
 
Geography Building DestructionGeography Building Destruction
Start: May 2005 | End: July 2005
 
Athletic Strength and Conditioning Training Facility Renovation & UpgradeAthletic Strength and Conditioning Training Facility Renovation & Upgrade
Start: May 2005 | End: June 2005
 
Boone Pickens Stadium Expansion Phase 2Boone Pickens Stadium Expansion Phase 2
Start: February 2005 | End: September 2006
Description: North Side Stadium Expansion
 
Phase IV SuitesPhase IV Suites
Start: January 2005 | End: September 2006
 
Power Plant Cooling Tower ReplacementPower Plant Cooling Tower Replacement
Start: October 2004 | End: May 2005 | Cost: $751,913.00
Description: Replacing an exisiting cross flow cooling tower with a new counter flow cooling tower.
 
Motor Pool ExpansionMotor Pool Expansion
Start: February 2004 | End: October 2004 | Cost: $515,000.00
Description: Construction of a 2-bay bus maintenance and wash facility, plus expansion of the parking lot.
 
K.B. Droke Track & Field Center ImprovementsK.B. Droke Track & Field Center Improvements
Start: January 2004 | End: January 2004
Description: Track & Field Improvements
 
ConocoPhillips OSU Alumni Center ConstructionConocoPhillips OSU Alumni Center Construction
Start: August 2003 | End: August 2005 | Cost: $13,000,000.00
Description: Construction of the new Alumni Center across from the Student Union
Read more about it...
 
Boone Pickens Stadium Expansion Phase 1Boone Pickens Stadium Expansion Phase 1
Start: June 2003 | End: January 2004
Description: South Side Stadium Expansion.
 
Seretean Center Sidewalk and Main Entrance ImprovementsSeretean Center Sidewalk and Main Entrance Improvements
Start: June 2003 | End: April 2004
Description: Remodel of building front.
 
Veterinary Medicine ResearchVeterinary Medicine Research
Start: February 2003 | End: October 2004 | Cost: $1,600,000.00
Description: OADDL
 
The Market ConstructionThe Market Construction
Start: September 2002 | End: May 2003 | Cost: $3,990,000.00
Description: Construction of the new University Apartments Dining Facility
 
Colvin Center RenovationColvin Center Renovation
Start: August 2002 | End: July 2004 | Cost: $23,000,000.00
Description: Renovation and expansion of the Colvin Recreation Center.
Read more about it...
 
Bennett Hall RenovationBennett Hall Renovation
Start: August 2002 | End: August 2003 | Cost: $16,770,000.00
Description: Renovation of West Bennett Hall and Bennett Dining.
 
Stout Hall RenovationStout Hall Renovation
Start: August 2002 | End: May 2003 | Cost: $9,912,000.00
 
Swine Barn Lagoon FencingSwine Barn Lagoon Fencing
Start: June 2002 | End: June 2002 | Cost: $35,000.00
Description: Installation of an 8' high chain link fence around the two reactor lagoons at the new Swine Farm.
 
Softball Complex Shell CompletionSoftball Complex Shell Completion
Start: May 2002 | End: August 2002 | Cost: $277,000.00
Description: Finishing the space at the Women's Softball Complex.
 
Graphic Arts BuildingGraphic Arts Building
Start: May 2002 | End: December 2002 | Cost: $1,650,000.00
Description: The new Graphic Arts facility for the OSU Art Department.
 
Controlled Environmental Plant FacilityControlled Environmental Plant Facility
Start: April 2002 | End: May 2003 | Cost: $250,000.00
Description: New Ag Greenhouse built on Ridge Road.
 
Phase III SuitesPhase III Suites
Start: April 2002 | End: August 2003 | Cost: $13,200,000.00
 
Phase III UtilitiesPhase III Utilities
Start: April 2002 | End: September 2003
 
Architecture Window ReplacementArchitecture Window Replacement
Start: March 2002 | End: July 2002 | Cost: $200,000.00
Description: Windows replaced on East & South faces of Architeture Building.
 
Whitehurst 307 RemodelWhitehurst 307 Remodel
Start: November 2001 | End: July 2002 | Cost: $175,000.00
Description: Demolition and completed remodelling of 307 Whitehurst complex for CIS.
 
Swine Farm PortablesSwine Farm Portables
Start: September 2001 | End: May 2002 | Cost: $887,250.00
Description: These portables will house the Gestation, Farrowing, Nursery, and Finisher facilities for the relocated swine farm. This project will consist of 14 Modular Buildings (10 single wides and 2 double wides).
 
Physical Plant Administration Sod LayingPhysical Plant Administration Sod Laying
Start: September 2001 | End: February 2002
Description: Sodding and other landscape improvements around the Physical Plant Administration Building.
 
Physical Plant Warehouse ConstructionPhysical Plant Warehouse Construction
Start: September 2001 | End: November 2001
Description: Addition of a new Physical Plant warehouse.
 
Gallagher-Iba ScoreboardGallagher-Iba Scoreboard
Start: August 2001 | End: August 2001
Description: Replacing old scoreboard in Gallagher-Iba Arena.
 
Indoor Hitting Facility Initial ConstructionIndoor Hitting Facility Initial Construction
Start: July 2001 | End: December 2001
 
Engineering South HVAC RefurbishEngineering South HVAC Refurbish
Start: July 2001 | End: August 2001
 
Library Annex LandscapingLibrary Annex Landscaping
Start: June 2001 | End: August 2001 | Cost: $50,000.00
Description: Lanscaping to the parking lot and entrance area of the Library Annex.
 
Monroe Street Electrical Ductbank InstallationMonroe Street Electrical Ductbank Installation
Start: May 2001 | End: August 2001 | Cost: $100,000.00
Description: Installation of a medium-voltage ductbank in the sidewalk in front of Agriculture Building.
 
Fire Safety and Technology BuildingFire Safety and Technology Building
Start: May 2001 | End: December 2002 | Cost: $2,125,000.00
Description: The new Fire Safety and Technology Building for the College of Engineering, Architecture and Technology.
 
Whitehurst First Floor RemodelWhitehurst First Floor Remodel
Start: February 2001 | End: February 2001
Description: Total renovations to the first floor of Whitehurst.
 
Library AnnexLibrary Annex
Start: February 2001 | End: February 2001
Description: The old IGA building was abated and renovated to store books and house the recycling facility.
 
Rodeo Arena ConstructionRodeo Arena Construction
Start: February 2001 | End: February 2002 | Cost: $200,000.00
Description: Further additions to the newly constructed OSU Rodeo arena. The practice arena is 100' x 300'.
 
Soccer Field BleachersSoccer Field Bleachers
Start: October 2000 | End: June 2001 | Cost: $191,736.00
Description: The new Soccer Field bleachers have a 1000 seat capacity.
 
Sidewalks RepavingSidewalks Repaving
Start: October 2000 | End: October 2000 | Cost: $200,000.00
Description: New sidewalks, some of which were constructed to handle vehicle traffic.
 
Colvin Center Parking Lot ImprovementsColvin Center Parking Lot Improvements
Start: September 2000 | End: October 2000 | Cost: $218,508.00
Description: Both parking lots are being expanded to accomodate more parking.
 
McElroy Road ResurfacingMcElroy Road Resurfacing
Start: June 2000 | End: September 2000 | Cost: $130,000.00
Description: Project to repave the apartment area of McElroy road.
 
Phase 2 Housing UtilitiesPhase 2 Housing Utilities
Start: April 2000 | End: January 2001 | Cost: $2,000,000.00
Description: The utilities job associated with the Suites/Apartments Project will extend off-site to utilities.
 
Patchin-Jones Suites Initial ConstructionPatchin-Jones Suites Initial Construction
Start: April 2000 | End: August 2001 | Cost: $1,000,000.00
Description: The suites complex on Redwood St., west of Scott-Parker-Wentz, will contain 80 units (326 beds). It is being designed and built through Capstone Development Corporation. This is Phase 1 of a 3-phase housing program.
 
Peterson-Friend Hall and Kamm Hall Initial ConstructionPeterson-Friend Hall and Kamm Hall Initial Construction
Start: September 1999 | End: August 2000 | Cost: $10,000,000.00
Description: This project encompasses buildings 256, 257, and 258. The apartment complex at the southwest corner of Hall of Fame and McFarland contains 80 units (320 beds). It is being designed and built through Capstone Development Corporation. This is Phase 1 of a 3-phase housing program.
 
Phase 2 Housing ConstructionPhase 2 Housing Construction
Start: September 1999 | End: August 2001 | Cost: $10,000,000.00
Description: Phase 2 housing will contain: 169 Apartments with 548 beds; 84 Suites, 4 bedroom with 321 beds; 138 Family Living Units with 2 or 3 bedrooms and 294 beds. There will also be a community building with exercise room and vending/kitchen area. About half the units will be furnished. There will be 1163 parking spaces, one per bed.
 
Monroe Street ImprovementsMonroe Street Improvements
Start: June 1999 | End: September 1999
Description: Installation of lamps, pots, and landscaping along Monroe Street.
 
Drummond Lane, Lincoln Street, Stout Lane, Parking Lots 009, 011, 015, 027, 035, 036, 040, 041, 047, 052, and 055 RepavingDrummond Lane, Lincoln Street, Stout Lane, Parking Lots 009, 011, 015, 027, 035, 036, 040, 041, 047, 052, and 055 Repaving
Start: June 1999 | End: June 1999 | Cost: $471,050.00
Description: The asphalt repair and overlay work on OSU parking lots and streets this summer will encompass a11 lots and 3 streets.
 
Softball Complex ConstructionSoftball Complex Construction
Start: May 1999 | End: Spring 2000 | Cost: $1,600,000.00
Description: Construction of the New Cowgirl Softball Complex.
 
Edmon Low Library Carpet ReplacementEdmon Low Library Carpet Replacement
Start: May 1999 | End: June 1999 | Cost: $90,000.00
Description: Laying down 2,800 sq. yards of carpeting on the 3rd floor of the Edmon Low Library. This is the third stage of a four stage project. The first and second floors have been carpeted, and the fourth will likely be carpeted next year.
 
Theta Pond Ramp InstallationTheta Pond Ramp Installation
Start: March 1999 | End: March 1999
Description: Installing handicapped-accessible ramps to the pond.
 
Physical Plant Services Supply Department Carpet CarouselPhysical Plant Services Supply Department Carpet Carousel
Start: January 1999 | End: January 1999 | Cost: $16,800.00
Description: The carpet carousel holds 8 rolls at 1,500lbs. ea., up to 175' long, and it automatically measures length. With carpet stocked in-store, wait time is reduced since individual carpet jobs don't wait for small amounts of carpet to be ordered. Four carpet colors and 2,400 yards of carpet will be available in stock.
 
Athletic Center ProjectAthletic Center Project
Start: January 1999 | End: March 2001 | Cost: $54,000,000.00
Description: Expanded existing Gallagher-Iba Arena to 13,000 seat capacity. Included new academic center, practice courts, and weights and training area.
 
Physical Plant Services Blacktop ReplacementPhysical Plant Services Blacktop Replacement
Start: December 1998 | End: December 1998 | Cost: $19,000.00
Description: Removed asphalt and replaced with 6 inch steel-reinforced concrete.
 
West Chilled Water Plant Phase I and Distribution SystemWest Chilled Water Plant Phase I and Distribution System
Start: October 1998 | End: July 2000 | Cost: $18,000,000.00
Description: Will provide 4,000 additional tons of cooling capacity to handle future campus loads. Facility will eventually have 16,000 tons of capacity.
 
Wes Watkins Center For International Trade Development General Grounds ImprovementsWes Watkins Center For International Trade Development General Grounds Improvements
Start: July 1998 | End: July 1998
Description: New planters installed.
 
Edmon Low Library General Grounds ImprovementsEdmon Low Library General Grounds Improvements
Start: July 1998 | End: July 1998
Description: New benches installed.
 
Agriculture General Grounds ImprovementsAgriculture General Grounds Improvements
Start: July 1998 | End: July 1998
 
Animal Sciences General Grounds ImprovementsAnimal Sciences General Grounds Improvements
Start: July 1998 | End: July 1998
 
Seretean Center For the Performing Arts General Grounds ImprovementsSeretean Center For the Performing Arts General Grounds Improvements
Start: July 1998 | End: July 1998
Description: Installation of Halvani's Sculpture of David's Harp
 
Whitehurst General Grounds ImprovementsWhitehurst General Grounds Improvements
Start: July 1998 | End: July 1998
 
Formal Gardens RenovationFormal Gardens Renovation
Start: April 1998 | End: August 1998 | Cost: $360,000.00
Description: Renovation of formal gardens west of Student Union, including new lighting, planting beds, walking surfaces, irrigation system and drainage. Friends and alumni of OSU have the opportunity to purchase engraved bricks to support maintenance and upkeep of the gardens. If you're interested, call at 744-7147.
 
Student Union Center for Services to StudentsStudent Union Center for Services to Students
Start: December 1997 | End: June 1999 | Cost: $7,800,000.00
Description: Addition to Student Union Building. Will house seven non-academic departments under one roof, including Bursar, Financial Aid, Scholarships, University Academic Services, Registrar, Admissions, High School and College Relations.
 
Removal of Asbestos Material from IGA BuildingRemoval of Asbestos Material from IGA Building
Start: July 1997 | End: July 1998 | Cost: $300,000.00
Description: Removal of asbestos material from old IGA building on N. Washington Street in preparation for remodeling the Library Annex.
 
Classroom Building RemodelClassroom Building Remodel
Start: July 1997 | End: July 1998 | Cost: $5,200,000.00
Description: Remodel of multi-purpose classrooms, lecture rooms and auditorium to enhance aesthetics and provide for state-of-the-art audio/visual/video teaching equipment.
 
Monroe Street ResurfacingMonroe Street Resurfacing
Start: June 1997 | End: August 1997 | Cost: $500,000.00
Description: Replaced surface asphalt and installed raised crosswalks that act as speed bumps to keep foot traffic out of the water.
 
Soccer Fields Initial ConstructionSoccer Fields Initial Construction
Start: January 1997 | End: October 1997 | Cost: $800,000.00
Description: Two fields were constructed, one for use by the women's varsity soccer team and the other for recreational purposes. Includes automatic irrigation and advanced drainage systems.
 
Boone Pickens Stadium North RemodelBoone Pickens Stadium North Remodel
Start: November 1996 | End: June 1997 | Cost: $475,000.00
Description: Removed lead base paint, repainted, installed hand rails and handicapped seating.
 
Boone Pickens Stadium South RemodelBoone Pickens Stadium South Remodel
Start: November 1996 | End: August 1997 | Cost: $560,000.00
Description: Removed lead base paint, replaced 10,000 sq. ft. of concrete decking, installed handicapped seating and hand rails, replaced some chair backs, and repainted.
 
Family Resource Center Initial ConstructionFamily Resource Center Initial Construction
Start: October 1996 | End: June 1998 | Cost: $1,100,000.00
Description: A 7,000+ square foot "Student Union" for the family housing area. Contains computer labs, play rooms, clothing exchange, patio, and "Great Room" for meetings, banquets and assemblies.
 
Advanced Technology Research CenterAdvanced Technology Research Center
Start: September 1995 | End: October 1997 | Cost: $31,000,000.00
Description: Research laboratories, lecture halls and administrative support offices for University/industry sponsored engineering technology research.
 
Oklahoma Food & Agricultural Products Research & Technology Center Initial ConstructionOklahoma Food & Agricultural Products Research & Technology Center Initial Construction
Start: November 1994 | End: July 1997 | Cost: $14,600,000.00
Description: Laboratories, offices and support facilities for research in food and agricultural projects processing programs.
 
 