CURRENT PROJECTS
| No Current Projects in the Gallery |
COMPLETED PROJECTS
Constructing a new Water TowerStartMay 2009EndMay 2010DescriptionAs part of the revitalization of the OSU Water Treatment Plant, one of the key components is the new 500,000 gallon water storage tower. Last winter, new water lines were installed to service the tower, and the foundation was poured. Maguire Iron, Inc., of Sioux Falls, South Dakota, put together the large steel panels that make up the tower. The dozens of large steel panels delivered from the factory were welded together into four major parts. Once ready, the stem, bowl bottom, and bowl top were hoisted into place. | |
McFarland Street ResurfacingStartJune 2005EndJune 2005 | |
Phase IV UtilitiesStartMay 2005EndDecember 2005 | |
Hedge Field Renovation and UpgradesStartMay 2005EndJuly 2005DescriptionHedge Field renovation. | |
Boone Pickens Stadium Turf ReplacementStartMay 2005EndSeptember 2005 | |
Geography Building DestructionStartMay 2005EndJuly 2005 | |
Athletic Strength and Conditioning Training Facility Renovation and UpgradeStartMay 2005EndJune 2005 | |
Boone Pickens Stadium Expansion Phase 2StartFebruary 2005EndSeptember 2006DescriptionNorth Side Stadium Expansion | |
Phase IV SuitesStartJanuary 2005EndSeptember 2006 | |
Power Plant Cooling Tower ReplacementStartOctober 2004EndMay 2005Cost$751,913.00DescriptionReplacing an exisiting cross flow cooling tower with a new counter flow cooling tower. | |
Motor Pool ExpansionStartFebruary 2004EndOctober 2004Cost$515,000.00DescriptionConstruction of a 2-bay bus maintenance and wash facility, plus expansion of the parking lot. | |
K.B. Droke Track and Field Center ImprovementsStartJanuary 2004EndJanuary 2004DescriptionTrack and Field Improvements | |
ConocoPhillips OSU Alumni Center ConstructionStartAugust 2003EndAugust 2005Cost$13,000,000.00DescriptionConstruction of the new Alumni Center across from the Student Unionat the . | |
Boone Pickens Stadium Expansion Phase 1StartJune 2003EndJanuary 2004DescriptionSouth Side Stadium Expansion. | |
Seretean Center Sidewalk and Main Entrance ImprovementsStartJune 2003EndApril 2004DescriptionRemodel of building front. | |
Veterinary Medicine ResearchStartFebruary 2003EndOctober 2004Cost$1,600,000.00DescriptionOADDL | |
The Market ConstructionStartSeptember 2002EndMay 2003Cost$3,990,000.00DescriptionConstruction of the new University Apartments Dining Facility | |
Colvin Center RenovationStartAugust 2002EndJuly 2004Cost$23,000,000.00DescriptionRenovation and expansion of the Colvin Recreation Center.at the . | |
Bennett Hall RenovationStartAugust 2002EndAugust 2003Cost$16,770,000.00DescriptionRenovation of West Bennett Hall and Bennett Dining. | |
Stout Hall RenovationStartAugust 2002EndMay 2003Cost$9,912,000.00 | |
Swine Barn Lagoon FencingStartJune 2002EndJune 2002Cost$35,000.00DescriptionInstallation of an 8' high chain link fence around the two reactor lagoons at the new Swine Farm. | |
Softball Complex Shell CompletionStartMay 2002EndAugust 2002Cost$277,000.00DescriptionFinishing the space at the Women's Softball Complex. | |
Graphic Arts BuildingStartMay 2002EndDecember 2002Cost$1,650,000.00DescriptionThe new Graphic Arts facility for the OSU Art Department. | |
Controlled Environmental Plant FacilityStartApril 2002EndMay 2003Cost$250,000.00DescriptionNew Ag Greenhouse built on Ridge Road. | |
Phase III SuitesStartApril 2002EndAugust 2003Cost$13,200,000.00 | |
Phase III UtilitiesStartApril 2002EndSeptember 2003 | |
Architecture Window ReplacementStartMarch 2002EndJuly 2002Cost$200,000.00DescriptionWindows replaced on East and South faces of Architeture Building. | |
Whitehurst 307 RemodelStartNovember 2001EndJuly 2002Cost$175,000.00DescriptionDemolition and completed remodelling of 307 Whitehurst complex for CIS. | |
Swine Farm PortablesStartSeptember 2001EndMay 2002Cost$887,250.00DescriptionThese portables will house the Gestation, Farrowing, Nursery, and Finisher facilities for the relocated swine farm. This project will consist of 14 Modular Buildings (10 single wides and 2 double wides). | |
Physical Plant Administration Sod LayingStartSeptember 2001EndFebruary 2002DescriptionSodding and other landscape improvements around the Physical Plant Administration Building. | |
Physical Plant Warehouse ConstructionStartSeptember 2001EndNovember 2001DescriptionAddition of a new Physical Plant warehouse. | |
Gallagher-Iba ScoreboardStartAugust 2001EndAugust 2001DescriptionReplacing old scoreboard in Gallagher-Iba Arena. | |
Indoor Hitting Facility Initial ConstructionStartJuly 2001EndDecember 2001 | |
Engineering South HVAC RefurbishStartJuly 2001EndAugust 2001 | |
Library Annex LandscapingStartJune 2001EndAugust 2001Cost$50,000.00DescriptionLanscaping to the parking lot and entrance area of the Library Annex. | |
Monroe Street Electrical Ductbank InstallationStartMay 2001EndAugust 2001Cost$100,000.00DescriptionInstallation of a medium-voltage ductbank in the sidewalk in front of Agriculture Building. | |
Fire Safety and Technology BuildingStartMay 2001EndDecember 2002Cost$2,125,000.00DescriptionThe new Fire Safety and Technology Building for the College of Engineering, Architecture and Technology. | |
Whitehurst First Floor RemodelStartFebruary 2001EndFebruary 2001DescriptionTotal renovations to the first floor of Whitehurst. | |
Library AnnexStartFebruary 2001EndFebruary 2001DescriptionThe old IGA building was abated and renovated to store books and house the recycling facility. | |
Rodeo Arena ConstructionStartFebruary 2001EndFebruary 2002Cost$200,000.00DescriptionFurther additions to the newly constructed OSU Rodeo arena. The practice arena is 100' x 300'. | |
Soccer Field BleachersStartOctober 2000EndJune 2001Cost$191,736.00DescriptionThe new Soccer Field bleachers have a 1000 seat capacity. | |
Sidewalks RepavingStartOctober 2000EndOctober 2000Cost$200,000.00DescriptionNew sidewalks, some of which were constructed to handle vehicle traffic. | |
Colvin Center Parking Lot ImprovementsStartSeptember 2000EndOctober 2000Cost$218,508.00DescriptionBoth parking lots are being expanded to accomodate more parking. | |
McElroy Road ResurfacingStartJune 2000EndSeptember 2000Cost$130,000.00DescriptionProject to repave the apartment area of McElroy road. | |
Phase 2 Housing UtilitiesStartApril 2000EndJanuary 2001Cost$2,000,000.00DescriptionThe utilities job associated with the Suites/Apartments Project will extend off-site to utilities. | |
Patchin-Jones Suites Initial ConstructionStartApril 2000EndAugust 2001Cost$1,000,000.00DescriptionThe suites complex on Redwood St., west of Scott-Parker-Wentz, will contain 80 units (326 beds). It is being designed and built through Capstone Development Corporation. This is Phase 1 of a 3-phase housing program. | |
Peterson-Friend Hall and Kamm Hall Initial ConstructionStartSeptember 1999EndAugust 2000Cost$10,000,000.00DescriptionThis project encompasses buildings 256, 257, and 258. The apartment complex at the southwest corner of Hall of Fame and McFarland contains 80 units (320 beds). It is being designed and built through Capstone Development Corporation. This is Phase 1 of a 3-phase housing program. | |
Phase 2 Housing ConstructionStartSeptember 1999EndAugust 2001Cost$10,000,000.00DescriptionPhase 2 housing will contain: 169 Apartments with 548 beds; 84 Suites, 4 bedroom with 321 beds; 138 Family Living Units with 2 or 3 bedrooms and 294 beds. There will also be a community building with exercise room and vending/kitchen area. About half the units will be furnished. There will be 1163 parking spaces, one per bed. | |
Monroe Street ImprovementsStartJune 1999EndSeptember 1999DescriptionInstallation of lamps, pots, and landscaping along Monroe Street. | |
Drummond Lane, Lincoln Street, Stout Lane, Parking Lots 009, 011, 015, 027, 035, 036, 040, 041, 047, 052, and 055 RepavingStartJune 1999EndJune 1999Cost$471,050.00DescriptionThe asphalt repair and overlay work on OSU parking lots and streets this summer will encompass a11 lots and 3 streets. | |
Softball Complex ConstructionStartMay 1999EndSpring 2000Cost$1,600,000.00DescriptionConstruction of the New Cowgirl Softball Complex. | |
Edmon Low Library Carpet ReplacementStartMay 1999EndJune 1999Cost$90,000.00DescriptionLaying down 2,800 sq. yards of carpeting on the 3rd floor of the Edmon Low Library. This is the third stage of a four stage project. The first and second floors have been carpeted, and the fourth will likely be carpeted next year. | |
Theta Pond Ramp InstallationStartMarch 1999EndMarch 1999DescriptionInstalling handicapped-accessible ramps to the pond. | |
Physical Plant Services Supply Department Carpet CarouselStartJanuary 1999EndJanuary 1999Cost$16,800.00DescriptionThe carpet carousel holds 8 rolls at 1,500lbs. ea., up to 175' long, and it automatically measures length. With carpet stocked in-store, wait time is reduced since individual carpet jobs don't wait for small amounts of carpet to be ordered. Four carpet colors and 2,400 yards of carpet will be available in stock. | |
Athletic Center ProjectStartJanuary 1999EndMarch 2001Cost$54,000,000.00DescriptionExpanded existing Gallagher-Iba Arena to 13,000 seat capacity. Included new academic center, practice courts, and weights and training area. | |
Physical Plant Services Blacktop ReplacementStartDecember 1998EndDecember 1998Cost$19,000.00DescriptionRemoved asphalt and replaced with 6 inch steel-reinforced concrete. | |
West Chilled Water Plant Phase I and Distribution SystemStartOctober 1998EndJuly 2000Cost$18,000,000.00DescriptionWill provide 4,000 additional tons of cooling capacity to handle future campus loads. Facility will eventually have 16,000 tons of capacity. | |
Wes Watkins Center For International Trade Development General Grounds ImprovementsStartJuly 1998EndJuly 1998DescriptionNew planters installed. | |
Edmon Low Library General Grounds ImprovementsStartJuly 1998EndJuly 1998DescriptionNew benches installed. | |
Agriculture General Grounds ImprovementsStartJuly 1998EndJuly 1998 | |
Animal Sciences General Grounds ImprovementsStartJuly 1998EndJuly 1998 | |
Seretean Center For the Performing Arts General Grounds ImprovementsStartJuly 1998EndJuly 1998DescriptionInstallation of Halvani's Sculpture of David's Harp | |
Whitehurst General Grounds ImprovementsStartJuly 1998EndJuly 1998 | |
Formal Gardens RenovationStartApril 1998EndAugust 1998Cost$360,000.00DescriptionRenovation of formal gardens west of Student Union, including new lighting, planting beds, walking surfaces, irrigation system and drainage. Friends and alumni of OSU have the opportunity to purchase engraved bricks to support maintenance and upkeep of the gardens. If you're interested, call at 744-7147. | |
Student Union Center for Services to StudentsStartDecember 1997EndJune 1999Cost$7,800,000.00DescriptionAddition to Student Union Building. Will house seven non-academic departments under one roof, including Bursar, Financial Aid, Scholarships, University Academic Services, Registrar, Admissions, High School and College Relations. | |
Removal of Asbestos Material from IGA BuildingStartJuly 1997EndJuly 1998Cost$300,000.00DescriptionRemoval of asbestos material from old IGA building on N. Washington Street in preparation for remodeling the Library Annex. | |
Classroom Building RemodelStartJuly 1997EndJuly 1998Cost$5,200,000.00DescriptionRemodel of multi-purpose classrooms, lecture rooms and auditorium to enhance aesthetics and provide for state-of-the-art audio/visual/video teaching equipment. | |
Monroe Street ResurfacingStartJune 1997EndAugust 1997Cost$500,000.00DescriptionReplaced surface asphalt and installed raised crosswalks that act as speed bumps to keep foot traffic out of the water. | |
Soccer Fields Initial ConstructionStartJanuary 1997EndOctober 1997Cost$800,000.00DescriptionTwo fields were constructed, one for use by the women's varsity soccer team and the other for recreational purposes. Includes automatic irrigation and advanced drainage systems. | |
Boone Pickens Stadium North RemodelStartNovember 1996EndJune 1997Cost$475,000.00DescriptionRemoved lead base paint, repainted, installed hand rails and handicapped seating. | |
Boone Pickens Stadium South RemodelStartNovember 1996EndAugust 1997Cost$560,000.00DescriptionRemoved lead base paint, replaced 10,000 sq. ft. of concrete decking, installed handicapped seating and hand rails, replaced some chair backs, and repainted. | |
Family Resource Center Initial ConstructionStartOctober 1996EndJune 1998Cost$1,100,000.00DescriptionA 7,000+ square foot "Student Union" for the family housing area. Contains computer labs, play rooms, clothing exchange, patio, and "Great Room" for meetings, banquets and assemblies. | |
Advanced Technology Research CenterStartSeptember 1995EndOctober 1997Cost$31,000,000.00DescriptionResearch laboratories, lecture halls and administrative support offices for University/industry sponsored engineering technology research. | |
Oklahoma Food and Agricultural Products Research and Technology Center Initial ConstructionStartNovember 1994EndJuly 1997Cost$14,600,000.00DescriptionLaboratories, offices and support facilities for research in food and agricultural projects processing programs. | |